CHANDRAKANT ARVINDRAO DHAGE
About Me
Work Experience: Fifteen Years (15 yrs.)
1). currently working in SUPREME BITUCHEM PVT. LTD.
Currently Working on SUPREME AVENUE TOWNSHIP PROJECT.
(Period Dec23 to Till Date)
I: Project title: Construction of Residential Township at Beltarodi Nagpur.
Location : Beltarodi Nagpur Maharashtra.
Client : SBIPL
Consultant : Pawan Gupta
Job Responsibilities:
Followups for EC clearance.
Finalize the floor plans and elevation.
Identified and finalizing the Manpower, Material and machinery required for project
completion.
Review structure design with structural designer.
Finalization of Cash inflow, Assets, milestone of project.
Prepared detailed L4 planning according to milestone.
Prepared Safety and Quality plan for project.
Conduct daily progress review meetings with key persons of projects. And assigned the
weekly target to them.
Check and monitor all incoming material utilization.
Preparation of daily, weekly, monthly, reports on work progress (key performance
indicator) & evaluating as per the planned schedules.
Work Experience in KEC INTERNATIONAL LIMITED.
(Period Jan-12 to Dec 23) 12 years.
Reliance Shopping Complex & VIP Guest House project.
Reliance Green Township Jamnagar Gujrat.
I: Project title: Construction of Shopping Complex and VIP Guest house including Basement
and drainage works for Reliance Green Township Jamnagar Gujrat.
Location : RIL Township Jamnagar Gujrat.
Client : Reliance Industries Limited (RIL)
Consultant : Maruti Consultant & Studio Akikrit
Job Responsibilities:
Prepare Zero cost Budget and JCR for project.
Prepared detailed L4 planning according to milestone.
Prepared Safety and Quality plan for project.
Conduct daily progress review meetings with key persons of projects. And assigned the
weekly target to them.
Check and monitor all incoming material utilization with vendor’s approvals as per
client’s standard & making correlation.
Attend Clint meetings regarding safety, quality, progress, and collections.
Finalizing the MIS reports.
Identified and finalizing the Manpower, Material and machinery required for project
completion.
Preparation of daily, weekly, monthly, reports on work progress (key performance
indicator) & evaluating as per the planned schedules.
Attending the client meeting regarding the status of work.
Project handle
Godrej Hillside Mahalunge Pune.
1: Project title: Construction of Residential towers and MLCP for Godrej Hillside project Pune.
.
Location : Mahalunge, Dist. Pune Maharashtra.
Client : Godrej Projects Limited (GPL)
Consultant : JEM.
Job Responsibilities:
Execute the work as per the schedule and drawing and design.
Assigned the work on daily basis to Engineers and supervisors in line with our schedule
duration.
Calculate the manpower, machineries and material requirement and their optimum uses.
Fix the work on Lum Sum basis with Contractor head considering profitability to achieve
the milestone.
Study the detail drawing for minute details and send RFI to clint in advance for nonaffecting progress.
Attend Clint meetings regarding safety, quality, progress, and collections.
Prepared contractor billing with actual progress on site. And follow Up for their timely
payments.
Identified and finalizing the Manpower, Material and machinery required for project
completion.
Preparation of daily, weekly, monthly, reports on work progress (key performance
indicator) & evaluating as per the planned schedules.
Attending the client meeting regarding the status of work.
RCCPL Cement plant project
M. P. Birla Cement plant known as RCCPL.
2: Project title : Construction of Cement plant Kiln Piers, Cooler Building, ESP building,
Load centers & Steel Structural works for RCCPL Mukutban.
Location : Mukutban Dist. Yavatmal Maharashtra.
Client : M. P. Birla (RCCPL)
Consultant : TATA Projects Ltd.
Project handle
Ashok Leyland Bus Body plant (PEB works)
3: Project title: Construction of PEB works for Ashok Leyland Bus Body plant including
Assembly shop building, Main plant building, SDC building, STC Building, Admin Building
and 1200 MT structure steel works, infra development including internal Roads, Drainages
works, sewage line and fire fighting line inside the plant.
Location : Mallavalli Industrial Zone, Vijayawada.
Client : Ashok Leyland
Consultant : Sijcon Consultant Pvt. Ltd
4: Project title : Construction of Intake well, Break water tanks, Road crossings, Nallaha
crossings, River Crossings, Steel structure bridge, Infra development inside the building and
Switchgear Building for MUW system NTPC Solapur.
Location : Ujjani Dam, Solapur.
Client : NTPC Solapur.
Project handle:
5: Project title : Construction of Main canal along with its distributaries, minors, sub minors
to irrigate the 10000 Hector Land.
Position : Senior Field Engineer.
Location :Sironch MP.
Client : WRD Bhopal.
Job Responsibilities
Achieving Construction Activities like Excavation, Foundation, PCC, RCC and Shuttering, steel
fixing, casting concrete, lining for canal, VRB, DRB, fall, Syphon, Etc. Up to completion.
Independently following with Design engineers of, Architecture, and Structural Updated drawing
for minor changes, as per site requirement needed and Inspection before execution.
Looking after construction activities, making requisition, and facilitating the arrangement
Procurement of construction materials. Executions of civil structural works and Site Supervision.
Experience in Vijaywargi & Sons. :
From July-2009 to Dec-2011
Total Experience: -2.5Years
Project handle:
6: Project title : Construction of Earthen Dam & its distribution system.
Position : Project In charge
Location :Chindwara (MP)
Client : WRD (MP)
7: Project title: Rehabilitation of main canal for Itiadoh Dam Project
Position : Project In charge
Location :Gondia (MH)
Client : Irrigation Department Gondia
Personal Strength:
Excellent communication skills.
Hardworking Sincerity and Honesty
Individual & team working Capability
Knowledge of 5M (Minutes,Manpower.Material,Machine,Management )
Manage development of program strategies.